TFTrailFuTrust the dirt
app.trailfu.com preview

Route planning is a promise, not a doodle.

This preview keeps the routing contract visible: target mileage, connected trail graph, route confidence, OSM source status, gap detection, connector miles, and send-to-phone handoff.

Route planning contract

The route can be shorter. It cannot be fake.

Build 3 previews the big-screen route planner as a trust interface. Target mileage is treated as intent, not permission to stitch together trails that do not connect.

Bentonville 24 mile linked loop

Target 24.5 mi

21.8 mi confirmed trail, 2.7 mi road/connectors labeled

Confidence: Medium high

No disconnected trail collage. Remaining mileage requires honest connector miles.

Sedona red rock sampler

Target 16 mi

Data review required before export

Confidence: Draft only

Do not claim ride-ready until connected trail graph is validated.

Park City climbing day

Target 22 mi

Loop style and elevation profile saved as intent

Confidence: Future-ready

Trail status and local rules must be checked by rider.

Validated trail graph

Confirmed trailsConnector miles labeledNo disconnected collage

Target mileage

A request, not a license to invent lines.

Connector miles

Allowed only when clearly labeled.

No disconnected collage

Trail sections must form a rideable plan.